18 May 2008

Major Assignment - Hollow Core Research Update 2

Ok, well here is where I am with the hollow core research so far:

The ground floor will have a poured slab and strip footing system so the research into hollow core planks will only apply to the first floor and roof, columns and bearers. The planks which I want to span the first floor for about 8m (not 15m), according to the span chart provided by www.hollowcore.com.au will need to use 205mm thick hollow core. (link to detailing manual)


- Load span chart:

Image from 'Detailing Manual', p. 7., www.hollowcore.com.au

-----------------------------------------------------------------

- Detail of 205 hollow core plank:

Image from 'Detailing Manual', p. 7., www.hollowcore.com.au
-----------------------------------------------------------------


I've also found some great details which may assist with understanding how this will all get put together:

- Detail of beam, column, hollow core connection:
Image from 'Detailing Manual', p. 33., www.hollowcore.com.au
-----------------------------------------------------------------



- Detail of cobel wall to hollow core plank flooring:
Image from 'Detailing Manual', p. 35., www.hollowcore.com.au
-----------------------------------------------------------------

- Detail of wall to hollow core connection:
Image from 'Detailing Manual', p. 36., www.hollowcore.com.au
-----------------------------------------------------------------

- Another detail of wall to hollow core connection:


Image from 'Detailing Manual', p. 36., www.hollowcore.com.au
-----------------------------------------------------------------

- Detail of column base connection:

Image from 'Detailing Manual', p. 40., www.hollowcore.com.au


No comments: