28 March 2008

Current Events in Construction

Newspaper article in The Age, 26st March 2008

21 March 2008

Tutorial Exercise 3

Task: Draw a wall section of a steel portal frame building.

17 March 2008

14 March 2008

Tutorial Exercise 2

Task: Draw a portal frame section showing knee joint and footing


7 March 2008

Tutorial Exercise 1- Site Visit

Task: Photograph a building and discuss

Building Name: TWOMMS Pty Ltd / Counterpoint, Warehouse and distribution centre
Designed and built by: Access Constructions PTY LTD.
Address: Marshall Court, Altona
Date Completed: May 2007




Front facade,
TWOMMS Pty Ltd / Counterpoint, Warehouse and distribution centre, Access Constructions PTY LTD, Marshall Court, Altona, Completed May 2007.

Here you see the office and car park approach to the warehouse.

-------------------------------------------------------------------------------------------------


Truck Loading area, TWOMMS Pty Ltd / Counterpoint, Warehouse and distribution centre, Access Constructions PTY LTD, Marshall Court, Altona, Completed May 2007.

An interesting element of the building
  • The designer 'Access Constructions' has extended the red painted UB stanchions through the top of the roof to create an interesting design element. A simple but effective technique of using functional elements of a building as design elements.
  • A tray clad front was then added to conceal the exposed portal frame.
  • Rigid base portal frame.

-------------------------------------------------------------------------------------------------


Truck Loading area, TWOMMS Pty Ltd / Counterpoint, Warehouse and distribution centre, Access Constructions PTY LTD, Marshall Court, Altona, Completed May 2007.

Close up detail
  • UB Stanchion connection to UB rafter.
  • Z section purlins sit on UB rafter. Note safety mesh and tray roofing.
  • Diagonal cross bracing.

-------------------------------------------------------------------------------------------------


Truck Loading area, TWOMMS Pty Ltd / Counterpoint, Warehouse and distribution centre, Access Constructions PTY LTD, Marshall Court, Altona, Completed May 2007.

Corner detail
  • UB Stanchion connection to UB rafter.
  • Blue tray cladding wraps the roof to conceal the rafters and underside of the roof.
  • Cross bracing between rafters.
  • Bracing between rafter and purlins.

-------------------------------------------------------------------------------------------------


Truck Loading area, TWOMMS Pty Ltd / Counterpoint, Warehouse and distribution centre, Access Constructions PTY LTD, Marshall Court, Altona, Completed May 2007.

Underside of roof
  • Two rows of UB rafters visible, note apex and haunching.
  • Red painted water pipes and lighting.
  • Cross bracing for rafters on outer row only.

Tutorial Exercise 1- Drawing

Task: Draw an exterior wall section through a house with brick veneer and timber stud wall.